TOC

LATEST NEWS

PEMA releases global market surveys on port equipment deliveries

January 15, 2015 – The Port Equipment Manufacturers Association (PEMA) has publicly released its l...

read more

Port Equipment Manufacturers Association welcomes four new members

ZPMC, Nantong Heavy Rainbow Machineries, Spohn + Burkhardt and INTERCON Technical Information System...

read more

PEMA Joins International Association of Port Cities

July 19, 2018 – PEMA joins the International Association of Port Cities (AIVP), solidifying the co...

read more

PEMA Autumn Members Meeting 2018

July 5, 2018 – PEMA is pleased to announce that its Autumn Members Meeting 2018 will take place at...

read more

University of Hamburg Team win PEMA Student Challenge for Second Year Running

June 29, 2018 – The Port Equipment Manufacturers Association (PEMA) hosts the PEMA Student Ch...

read more

Fuel consumption minimised with new Kalmar SmartPower RTG

13.03.2012 – Cargotec introduces a new rubber tyred gantry (RTG) crane, Kalmar SmartPower RTG, which minimises fuel consumption and provides a balance between productivity and cost efficiency.

The new crane is equipped with an intelligent power management system and a significantly smaller diesel engine compared to conventional RTGs. These technological innovations lead to a fuel consumption of only 9 litres per operational hour in typical RTG applications, which is claimed to be the lowest fuel consumption without energy storage in the industry.

In the Kalmar SmartPower RTG, the new power management system ensures the most economical engine RPM is used at all times during operation and controls speeds and accelerations to reduce the peak power requirement. With Cargotec’s new approach, energy consumption and exhaust emissions are greatly reduced. The new Kalmar SmartPower RTG is based on Kalmar E-One2 all-electric design without any hydraulics and it incorporates the industry leading safety levels already featured in the Kalmar E-One2 RTGs.

The whole Kalmar E-One2 product family including the Zero Emission RTG with electric power supply helps customers to meet the latest environmental demands without sacrificing operational productivity and lifetime cost efficiency. The E-One2’s maintenance interval of 1.000 hours, for both crane and optionally for engine, remains by far the longest in the industry and considerably increases terminal operational efficiency.

“In a typical RTG operation between 9 and 18 containers are handled per hour. This is a very good fit for the SmartPower RTG, which provides the perfect balance between productivity and cost efficiency”, says RTG Product Manager, Marko Rasinen.

For more information, please contact:

Marko Rasinen, Product Manager RTG
Tel: +358 3 265 8284

Maija Eklöf, Director, Communications and Marketing, Terminals
Tel: +358 20 777 4096

OUR MEMBERS

MEMBER LOGIN

JOIN OUR MAILING LIST